Hoppa till innehåll

Finland and Sweden sign procurement contract for the design of the next generation icebreakers on 3rd November

Published 2.11.2020 13.01

The winner of the joint procurement for design of the icebreakers is Aker Arctic Technology Inc from Finland. This extensive design project is worth EUR 3–4 million, and the work will be completed by the end of 2021. No decision has been made yet on the construction of icebreakers.

Icebreaking is essential to ensure transports to northern Sweden and Finland during wintertime. Cargo ships need aid and a clear path to be able to pick up and collect goods from the critical industries in our countries. Today we have five active icebreakers in Sweden and nine in Finland. The fleet is ageing and therefore new icebreakers need to be built in order to keep the trade ongoing.

The first stage in building new icebreakers is the design

This joint procurement is a continuation of an extensive and close cooperation between Finland and Sweden. In the process to design the new generation of icebreakers, the emphasis is to find solutions to maintain the service level as the operating environment changes. The size of merchant vessels entering Finnish and Swedish ports is growing, and increasing environmental requirements gradually limit the engine power of the vessels. The growing size of the vessels that need assistance and the weakening of their abilities to handle ice-covered waters make it difficult for vessels to pass through ice masses in challenging ice conditions in the Baltic Sea, which increases the need for icebreaker assistance.

"Our foreign trade and competitiveness are based on year-round security of supply. The stocks of import and export logistics are largely located in moving ships. An adequate level of assistance available from icebreakers is a prerequisite for ensuring that the raw materials and different products are in the right place at the right time. New types of solutions are expected from this design project to respond to changes in the operating environment as well as to maintain an adequate level of service also in the future", says Kari Wihlman, Director-General of the Finnish Transport Infrastructure Agency.

"The Swedish industry is dependent on icebreaking in the Baltic Sea up to 130 days a year. Our current fleet is old with increasing needs of repairs. Therefore we very much look forward to the design of the next generation of icebreakers to service larger ships in a fossil free environment", says Katarina Norén, Director-General of the Swedish Maritime Administration.

Solution to the future icebreaking needs

The design process starts with research and evaluation on alternative icebreaker concepts. The new icebreaker is required to be able to assist ships with 32 m beam. Cost-effective operation, low life-cycle costs, the transition to fossil-free fuel by 2030 and the reduction of CO2 emissions are also important goals.

“This new ship will represent a completely new generation of icebreakers. It will incorporate design, construction and operational experience from existing Baltic assistance icebreakers as well as our other icebreaker designs. As the operational requirements and environmental conditions are changing in the Bothnian Bay, we will work closely with the Finnish and Swedish operators to jointly develop a solution that best answers to the future icebreaking needs. With an operational lifetime spanning half a century, the new icebreaker must be designed to comply with future emission goals. Responding to this major technological challenge today will require us to apply the full extent of our icebreaker design expertise as well as to utilize the latest environmental technologies developed by the maritime industry", says Reko-Antti Suojanen, Managing Director of Aker Arctic. 

"The design goals of this project are ambitious, and even though we have just designed icebreakers capable of reaching the North Pole, we consider this new icebreaker to be the most challenging design task we have ever faced.”

The joint procurement, which has been prepared for six months, attracted interest in the sector. The pre-qualification requirements for the two-staged tendering process (negotiated procedure with prior publication) were met by three tenderers, and at the final stage of the tendering process, one tender was received.

A concept will be selected in March when the first cost estimate for the construction of the icebreaker is available. After this, the focus will be on the design details and construction specification, which will form the basis of the shipyard tendering process once a decision to build the icebreakers is made.

Further information:

Finnish Transport Infrastructure Agency, Division Director, Juuso Kummala tel. +358 29 534 3548

Swedish Maritime Administration, media contacts + 46 771 40 90 09

Aker Arctic, Managing Director Reko-Antti Suojanen tel. +358 400 738 123


This is an old article. It may contain deprecated information and the links may not work. Our publications can be found in the Doria publication archive