Skip to content
Illustrational picture of a road.
Truck on a motorway.
Alt=""
Hailuoto Causeway
The plan is to build a causeway between Riutunkari in Oulu and Huikku on Hailuoto Island. The causeway will replace the current ferry service. The causeway will be approximately 8.4 kilometres long, and it will consist of a road running on top of an embankment and long bridges in Huikku and Riutunkari.
Read more
Illustrational picture of a rail.
Luumäki-Imatra railway project
A double-track railway is being built on the line Joutseno–Imatra, replacing the current single-track railway. The current track on the line Luumäki–Joutseno is also being improved. The project also comprises renovations to reduce the maintenance backlog on the Saimaa Canal Railway Bridge, the Mansikkakoski Railway Bridge and the underpass on the old Main Road 6.
Read more
alt=""
Development projects for border crossing points
The Finnish Transport Infrastructure Agency acts as a coordinator in six infrastructure development projects at the border crossing points of Raja-Jooseppi, Vartius, Parikkala, Imatra, Vainikkala and Vaalimaa funded jointly by the European Union and Finland. The projects will be implemented between 2019 and 2022.
Read more
null Road users’ satisfaction with the condition of roads in summer remained unchanged – a slight drop in satisfaction with winter maintenance was recorded

Road users’ satisfaction with the condition of roads in summer remained unchanged – a slight drop in satisfaction with winter maintenance was recorded

Published 8.12.2022

The Finnish Transport Infrastructure Agency examines road users’ satisfaction twice a year. One of the surveys concerns winter maintenance, while the other concerns the state and condition of roads during the summer season. The results of both surveys are now known.

Aura-auto talvella.

The more recent of these two surveys examined the condition of roads in summer 2022. According to the results, overall satisfaction with the state and condition of roads has remained at 2021 levels. However, there was a slight drop in satisfaction among professional drivers of heavy vehicles after an increase over the past few years.

“The uneven road surfaces and potholes that were noticed last winter and in spring are reflected in the results. Like the decline in pavement volumes, the pavement volumes themselves are normally seen in the satisfaction levels with one year delay. Only about 2,700 kilometres of roads were paved in 2021, compared with about 4,000 kilometres in 2020. Even though the rise in cost levels poses challenges and requires prioritisation of repair measures, all available resources are used as efficiently as possible,” explains Jarkko Pirinen, Specialist, Road Maintenance, at the Finnish Transport Infrastructure Agency.

Because less money is available than is needed, we must prioritise the maintenance of the busiest roads. This is also reflected in the results of the satisfaction surveys. Road users and professional drivers are fairly satisfied with the condition of the main roads but the condition of other roads is a cause for concern.

Slight drop in satisfaction with winter maintenance

Satisfaction with winter maintenance is similarly divided as satisfaction recorded during the summer months: satisfaction with the condition of the main roads is higher than the satisfaction with the state of the other roads. Moreover, as in summer, professional drivers of heavy vehicles are more critical than private individuals.

“In terms of weather, winter 2021–2022 was long and, especially in Southern Finland, it was quite different from what we have experienced in recent years. However, a snowy winter alone does not explain the drop in satisfaction levels. Even though overall satisfaction decreased, some maintenance contractors achieved better results than in the year before,” Pirinen says.

How is road users’ satisfaction examined?

The aim of the satisfaction surveys conducted among road users is to produce information on the experiences and opinions on winter road maintenance among private individuals and professional drivers of heavy vehicles. The survey results are used to monitor the performance of the Finnish Transport Infrastructure Agency and ELY Centres as well as to assist in the planning and steering of their work.

The data for the summer satisfaction survey was collected between 18 August and 30 September 2022 in an online panel and by means of a written questionnaire sent to the participants. A total of 4,895 private individuals and 1,087 professional drivers took part in the survey.

The data for the winter road maintenance satisfaction survey was collected between 28 January and 18 March 2022 by means of a written questionnaire sent to the respondents. The respondents could also take part in the survey online. A total of 8,060 private individuals and 1,250 professional drivers took part in the survey.
 


This is an old article. It may contain deprecated information and the links may not work. Our publications can be found in the Doria publication archive