Bridge construction.
Bridge construction.
Bridge construction.
Bridge construction.
Traffic Situation service
Information about road traffic (incidents and roadworks, congestions, road condition cameras), punctuality information about trains and sea traffic's warnings.
Give feedback
Here, you may give feedback, ask questions, suggest improvements and report issues regarding roads, railways and waterways. We process messages on weekdays.
Finnish Transport Infrastructure Agency
The Finnish Transport Infrastructure Agency is responsible for developing and maintaining the state-owned road network, the railways and the waterways. Through our tasks, which include maintaining the level of service of transport, we promote well-being in society and competitiveness of Finnish industry.
Are you looking for these?
Illustrational picture of a road.
Information for professional transport
Truck on a motorway.
Alt=""
Hailuoto Causeway
The plan is to build a causeway between Riutunkari in Oulu and Huikku on Hailuoto Island. The causeway will replace the current ferry service. The causeway will be approximately 8.4 kilometres long, and it will consist of a road running on top of an embankment and long bridges in Huikku and Riutunkari.
Illustrational picture of a rail.
Luumäki-Imatra railway project
A double-track railway is being built on the line Joutseno–Imatra, replacing the current single-track railway. The current track on the line Luumäki–Joutseno is also being improved. The project also comprises renovations to reduce the maintenance backlog on the Saimaa Canal Railway Bridge, the Mansikkakoski Railway Bridge and the underpass on the old Main Road 6.
alt=""
Development projects for border crossing points
The Finnish Transport Infrastructure Agency acts as a coordinator in six infrastructure development projects at the border crossing points of Raja-Jooseppi, Vartius, Parikkala, Imatra, Vainikkala and Vaalimaa funded jointly by the European Union and Finland. The projects will be implemented between 2019 and 2022.
News
- 30.11.2023 50 years of effective Finnish-Swedish cooperation in winter navigation research
- 20.11.2023 First icebreaking assistance restrictions enter into force in Tornio, Kemi and Oulu – Kontio heading for the Bothnian Bay for this weekend
- 15.11.2023 Feedback collected in the Bay of Bothnia on map markings of Aids to navigation to be removed for winter
- 16.10.2023 Track Condition Monitoring from In-Service Trains is Introduced in Finland
- 21.9.2023 More environmentally friendly and cost-effective operations by deepening waterways – Kemi Ajos fairway can now be reached by larger vessels
- 21.9.2023 Underwater construction requires special expertise
- 12.9.2023 Winter Navigation Research Board calls for research projects
- 2.6.2023 The winter of the icebreaking season 2022–2023 was mild and the season lasted 167 days
- 23.3.2023 Important news regarding the next material publication from Digiroad
- 22.3.2023 Finland is one of the leading countries in digital modelling of transport networks
- All news and releases
People working at FTIA.