Kupittaa–Turku railway project

Railway project Ongoing Southwest Finland

Kupittaa– Turku railway project  develops Turku's passenger and freight yards and builds a double track between Kupittaa and Turku railway station.

  • Planning 2021–2024
  • Construction 2021–2026
  • Completed 2026

Basic information of the project


Timetable
2021-2026
Contractor
Rejlers Finland oy
Costs
172 milj. €
Customer
Väylävirasto
Turun kaupunki
Goals

•    Enhancing and increasing rail transport capacity in the project area and along the entire coastal line with a double track
•    Increasing accessibility and safety at the Turku railway station platform area
•    Improving land use in the Turku city centre area
•    Contributing to the Helsinki–Turku high-speed train connection project
 
 

.

The Finnish Transport Infrastructure Agency is solely responsible for the content of this publication, and it does not necessarily reflect the opinion of the European Union.