Developing the Tampere railway station area

Railway project Ongoing Pirkanmaa

Developing the Tampere railway station area project improves the Tampere railway station area by renovating infrastructure, enhancing passenger conditions and increasing rail capacity for more efficient transport.

3D picture of the Itsenäisyydenkatu underpass, seen from west to east. The station tunnel and the tunnel of Itsenäisyydenkatu are connected to form a passenger terminal.
  • Starting
  • Procurement phase
  • Development phase
  • Construction

Basic information of the project


Download project card (pdf)
Timetable
2024-2030
Costs
202 milj. €
Responsible parties
Finnish Transport Infrastructure Agency
City of Tampere
VR-Yhtymä Oyj
Fintraffic Raide Oy
Goals
  • Improving the accessability, functionality and passenger conditions in the Tampere railway station area.
  • Renovation of end-of-life overpass and underpass bridges to meet future needs. 
  • Increasing rail capacity to enable more efficient rail transport. 
  • Creating the conditions for other developments in Tampere city centre. 

Content of the project

  • The linking of Asematunneli and Itsenäisyydenkatu tunnels to form a passenger terminal will enable smooth travel chains. 
  • A tram stop under the Itsenäisyydenkatu underpass will facilitate transfers between modes of transport and provide unobstructed access to the railway station area. 
  • The new 3rd island platform will allow for more passenger train services and reduce congestion in the yard.
  • The new shelters will provide comfort and a comfortable place to wait for the train, protected from the rain. 
  • All lift and escalator connections to the platforms will be renewed.
  • Several bridges that have reached the end of their life cycle will be renewed.
  • Track, safety and electric track modifications will upgrade the passenger yard technology to meet growing needs. 
  • Improving the throughput and building the Naistenlahti track system  for service traffic will require the renovation of the Erkkilä overpass. 
  • The relocation of the passenger service tracks to the Naistenlahti sidings  will allow the capacity of the passenger yard to be increased, as the maintenance  of passenger rolling stock will not take up space in the passenger yard. 

Location

A simplified map showing the extended Tampere railway station area, project area and main project sites.
A map showcasing the project area and project sites.